Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Митсубиси Паджеро
+ 1.1. The instrument panel and control means
+ 2. Maintenance service
- 3. Engines
   3.1. Candles
   3.2. Check of wires
   + 3.3. Ignition system
   - 3.4. Engine major repairs
      3.4.1. An engine electric equipment
      3.4.2. The ignition distributor
      + 3.4.3. The generator
      3.4.4. The battery
      3.4.5. A starter
      3.4.6. The traction relay of a starter
      3.4.7. Gauges
      + 3.4.8. Instructions on service and engine repair
      3.4.9. Compression check in cylinders of engines
      3.4.10. Specifications of engines
      + 3.4.11. Removal and engine installation
      3.4.12. A cover of a head of the block of cylinders
      + 3.4.13. Platens and коромысла
      3.4.14. The thermostat of system of cooling
      3.4.15. An inlet collector
      3.4.16. A final collector
      3.4.17. An incorporated collector (a diesel engine with a turbo-supercharging)
      3.4.18. Турбокомпрессор
      3.4.19. Турбонагнетатель
      3.4.20. A radiator
      3.4.21. Маслоохладитель
      3.4.22. The fan
      3.4.23. The pump of a cooling liquid
      + 3.4.24. A head of cylinders
      3.4.25. Valves and springs
      3.4.26. Saddles
      3.4.27. Replacement of directing plugs
      3.4.28. Hydropushers
      + 3.4.29. A gear belt and covers
      3.4.30. A chain and a cover (the engine 2,6)
      3.4.31. The oil pallet
      3.4.32. The oil pump and sajlent-platens (виброгасители)
      3.4.33. Cam-shafts and support
      3.4.34. Check of a condition of a cam-shaft
      + 3.4.35. Pistons and rods
      3.4.36. A back epiploon
      3.4.37. Radical bearings
      3.4.38. A flywheel
      + 3.4.39. An exhaust system
   + 3.5. Diesel and турбодизельный engines of 2,5 and 2,8 l
+ 4. Cooling system
+ 5. Greasing system
+ 6. The power supply system
+ 7. Release system
+ 8. Fuel system
+ 9. A running part
+ 10. A suspension bracket and a steering
+ 11. Brake system
+ 12. A body
+ 13. An electric equipment
+ 14. Electroschemes




ccf2698e

3.4.16. A final collector

THE GENERAL DATA

ENGINES OF 2,0 AND 2,6 L

Final collector of the engine of 2,0 and 2,6 l

1. The filter
2. An air offtake
3, 4. A branch pipe
5. An arm
6. A cover
7. The oxygen gauge
8. Самоподжимная a nut
9. A flange of an exhaust pipe
10, 13. A lining
11. A hook
12. A collector

Removal and installation

PERFORMANCE ORDER
1. Disconnect the battery from weight. Remove the air filter.
2. Disconnect from a collector an exhaust pipe (if necessary lift the car and turn away bolts from below).
3. Disconnect an air line, a mass wire and a hose. Remove an arm of the valve and a collector cover.
4. Grease nuts of a collector with a getting liquid. Turn out the oxygen gauge. Turn away a nut and remove a collector with язычковым the valve and a branch pipe.
5. Clear demountable planes of a collector and a head of cylinders.
6. Installation is carried out upside-down. Replace a lining, nuts of a collector and the damaged hairpins, having turned out them by means of 2 законтренных nuts. Tighten all connections with the moments specified in illustrations for the engine of 2,6 l.

ENGINES OF 2,4 L

Final collector of the engine of 2,4 l

1. A cover
2, 5. A lining
3. The oxygen gauge
4. A collector

Removal and installation

PERFORMANCE ORDER
1. Disconnect the battery from weight. Remove the air filter.
2. Remove a collector cover.
3. Lift redock of the car and disconnect from a collector an exhaust pipe.
4. Turn out the gauge of oxygen and disconnect a wire on weight.
5. Turn away a nut and remove a collector.
6. Installation is carried out upside-down. Replace linings. Tighten all connections by the demanded moments.

12-KLAPANNYJ THE ENGINE OF 3,0 L

Final collector 12-klapannogo the engine of 3,0 l

1. Oxygen gauges
2, 3. Exhaust pipes
4, 10, 17. Linings
5. An air line
6, 13. A guard
7. A hook
8. A generator arm
9, 16. A collector
11, 12. A tube and a lining
14. A rack of the levelling chamber
15. An arm

Removal and installation (the left collector)

PERFORMANCE ORDER
1. Remove the battery and a tray.
2. Disconnect from a collector exhaust pipes and fix their wire.
3. Remove a thermal guard of a collector.
4. Disconnect a tube рециркуляции with linings from both parties.
5. Remove a rack of an inlet collector with an arm.
6. Turn away a nut and remove a collector.
7. Installation is carried out upside-down. Replace all linings. Tighten all connections by the demanded moments.

Removal and installation (the right collector)

PERFORMANCE ORDER
1. Disconnect weight. Remove an air line.
2. Disconnect from a collector exhaust pipes and fix their wire.
3. Remove from a collector a thermal guard, the right hook and a generator prop.
4. Turn away a nut and remove a collector.
5. Check up a collector plane. A collector with cracks and with сдеформированной a plane (a deviation from calibre over 0,3 mm) replace.
6. Installation is carried out upside-down. Replace all linings. Tighten all connections by the demanded moments.

24-KLAPANNYJ THE ENGINE OF 3,0 L AND THE ENGINE OF 3,5 L

Final collector 24-klapannogo the engine of 3,0 l

1. A guard
2. A collector right
3, 6. Linings
5. A collector left

Final collector клапанного the engine of 3,5 l

1. A tube рециркуляции
2, 5, 8. Linings
3, 6. Guards
4. A collector right
5. A collector left

Removal and installation (the left collector)

PERFORMANCE ORDER
1. Remove the battery and a tray.
2. Disconnect from a collector exhaust pipes and fix their wire.
3. Remove a thermal guard of a collector.
4. Turn away a nut and remove a collector.
5. Check up a collector condition. A collector with cracks and with сдеформированной a plane (a deviation from calibre over 0,3 mm) replace.
6. Installation is carried out upside-down. Replace all linings. Tighten all connections by the demanded moments.

Removal and installation (the right collector)

PERFORMANCE ORDER
1. Disconnect weight. Remove an air line.
2. Disconnect from a collector exhaust pipes and fix their wire.
3. Remove from a collector a thermal guard.
4. Turn away a nut and remove a collector and a lining.
5. Check up a collector plane. A collector with cracks and with сдеформированной a plane (a deviation from calibre over 0,3 mm) replace.
6. Installation is carried out upside-down. Replace all linings. Tighten all connections by the demanded moments.