Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Митсубиси Паджеро
+ 1.1. The instrument panel and control means
+ 2. Maintenance service
+ 3. Engines
+ 4. Cooling system
+ 5. Greasing system
+ 6. The power supply system
+ 7. Release system
+ 8. Fuel system
- 9. A running part
   + 9.1. A mechanical transmission
   + 9.2. Coupling
   - 9.3. Automatic transmission
      9.3.1. Adjustments
      + 9.3.2. The blocking switch
      9.3.3. Check of adjustment of a cable of management by transmission
      9.3.4. The mechanism of management of transmission
      9.3.5. A shaft epiploon картера transmissions
      9.3.6. Removal and transmission installation
      9.3.7. A distributing box
      9.3.8. Forward and back epiploons
      + 9.3.9. Forward карданный a shaft and крестовины
      + 9.3.10. Back карданный a shaft and крестовины
      9.3.11. A forward leading axis
      9.3.12. A nave with a manual unblocking
      9.3.13. A nave with an automatic unblocking
      9.3.14. Forward semiaxes and epiploons of a forward axis
      9.3.15. A reducer of a forward axis
      9.3.16. Dismantling of SHRUS
   + 9.4. The back bridge
+ 10. A suspension bracket and a steering
+ 11. Brake system
+ 12. A body
+ 13. An electric equipment
+ 14. Electroschemes




ccf2698e

9.3.15. A reducer of a forward axis

THE GENERAL DATA

Reducer of a forward axis

1. A guard
2. External полуось
3, 5. A spring ring
4. Internal полуось
6. Карданный a shaft
7, 9, 11. Самоподжимная a nut
8, 13. Arms
10, 15. A reducer
12. A cross-beam
14. The semiaxis case

Removal and installation

PERFORMANCE ORDER
1. Lift car redock.
2. Remove the bottom guard and merge oil from a reducer.
3. Remove a nave in gathering with a fist and external semiaxes.
4. Remove internal полуось and forward карданный a shaft.
5. Prop up the case of a reducer the cart-jack.
6. Remove arms, having designated an arrangement of turned on bolts and nuts.
7. Самоподжимные nuts at assemblage replace.
8. Remove a cross-beam, considering considerable weight of this detail.
9. Lower and remove a reducer.
10. Installation is carried out upside-down.
11. Tighten connections according to the demanded moments, nuts and cross-beam bolts tighten with the moment 100–120 Н.м.
12. Replace spring rings of semiaxes.
13. At assemblage combine the labels put at dismantling, turn bolts on former places.