Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Митсубиси Паджеро
+ 1.1. The instrument panel and control means
+ 2. Maintenance service
+ 3. Engines
+ 4. Cooling system
+ 5. Greasing system
+ 6. The power supply system
+ 7. Release system
+ 8. Fuel system
+ 9. A running part
- 10. A suspension bracket and a steering
   10.1. Wheels
   - 10.2. A forward suspension bracket
      10.2.1. Торсион
      10.2.2. The shock-absorber
      10.2.3. The top spherical support of a suspension bracket
      10.2.4. The bottom spherical support
      10.2.5. The stabilizer of cross-section stability
      10.2.6. The top lever of a suspension bracket
      10.2.7. The bottom lever of a suspension bracket and replacement of plugs
      10.2.8. A rotary fist
      10.2.9. The bearing of a forward wheel
      10.2.10. Corners of installation of wheels
   + 10.3. A back suspension bracket
   + 10.4. A steering
+ 11. Brake system
+ 12. A body
+ 13. An electric equipment
+ 14. Electroschemes




ccf2698e

10.2.10. Corners of installation of wheels

THE GENERAL DATA

Corners of installation of forward wheels are checked and regulated only in car-care centre.

Corner of a longitudinal inclination of an axis of turn

At infringement of this corner the car badly "holds road", and the wheel does not come back (or slowly comes back) in driving position on a straight line after turn. It is regulated by moving of an axis of the top lever.

On considered cars this corner positive also should make 2°00 `–3°00 ' on а/м 1983-88 and 2°00 `–3°50 ` on а/м 1988-98

Disorder of wheels

It is regulated by selection of washers (adjusting linings).

On considered cars this corner positive also should make 0°30 `–1°30 ` on а/м 1983-91, 0°10 `–1°10 ` on а/м 1992-94 and 0°17 `–1°17 ` on а/м 1998

Corner of a convergence of wheels

It is regulated by change of length of steering draught at the weakened counternut.

The convergence is measured in mm, on considered cars the convergence of forward wheels positive and should be 2–9 mm on а/м 1983-91, 2–7 mm on а/м 1992-98